Jumeirah Beach Hotel Refurbishment Phase 1

Jumeirah Beach Hotel Refurbishment Phase 1

Fast track refurbishment for 70 guest rooms and associated corridors at the iconic 5 star Jumeirah Beach Hotel Resort. The ALEC FITOUT scope of works included demolition and stripping rooms back to shell and then installation of finishing and MEP packages.

Project details

  • Client: Jumeirah Group
  • Project Area: 3,000 m2
  • Project Manager: Davis Langdon
  • Cost Consultant: Flanagan Arabia
  • Interior Designer: Gettys
jumeirah-beach-hotel-1
jumeirah-beach-hotel-3
jumeirah-beach-hotel-4
jumeirah-beach-hotel-2
jumeirah-beach-hotel-1
jumeirah-beach-hotel-3
jumeirah-beach-hotel-4
jumeirah-beach-hotel-2